VER+ - Firnis 9.6 MW run of river Hydropower project, Turkey

Maraj Enerji plans to install two 4.8 MW vertical axis turbines (total capacity 9.6 MW) at Firnis Brook, which is one of the main branches of GÜREDN Creek spilling over Menzelet Dam Lake in Middle Ceyhan Basin. It is a run of river hydro power station making use of the elevation difference of 126 meters, producing renewable energy that will be fed into the Turkish electricity grid.

VALIDATION


The PDD was open for comments from November 20 to December 19, 2007
via eMail to the: Certification Body "climate and energy"

No comments have been received.

Following all project documents

PDD

Final documents

Final PDD
Validation Report

publication date, December 20, 2010